Planning application RR/578/CM(EIA)
Proposal with an Environmental Impact Assessment
- Reference:
- RR/578/CM(EIA)
- Address:
- Pebsham Waste & Recyclables Transfer Station, Freshfields Road, Pebsham.
- Proposal:
- Minor modifications to existing waste and recyclables transfer station to include new internal access, small extension to existing building and access to proposed household waste recycling site. Relocation of existing Hastings Household Waste Recycling Site to land south of existing waste and recyclables station.
- District:
- Rother
- Parish:
- Bexhill on Sea
- Electoral division:
- Bexhill East
- Received:
- 15 December 2008
- Consultation start:
- 23 January 2009
- Consultation end:
- 6 March 2009
- Applicant:
- Veolia ES South Downs Ltd
- Agent:
- Jacobs Engineering Uk Ltd
- Decision date:
- 25 June 2010
- Decision:
- Granted
- Case officer:
- Jeremy Patterson
- Enquiries:
-
01273 481626
Email: Development, Minerals & Waste
Documents
- Proposed Site Layout (Acrobat, 984k)
- EIA Statement for District Register (Word, 52k)
- Conditions 24,25,27,28 - Plans for Construction Environmental Management Plan (Acrobat, 263k)
- Letter from Agent re Conditions 21,22,24,25,27,28 (Acrobat, 77k)
- Site Layout Existing Plan 401(2) Rev P5 (Acrobat, 989k)
- Application Form Web Version (Acrobat, 1028k)
- Revised Site Location Plan 406(2) Rev P4 (Acrobat, 1226k)
- Plan : Planting Proposals (Acrobat, 4411k)
- Condition 7 - Covering Letter (Acrobat, 45k)
- Environmental Statement Non-Technical Summary (Acrobat, 1700k)
- Design and Access Statement (Acrobat, 134k)
- Pebsham Householed Waste Recycling Site - Phase 1 Environmental Desk Study (Acrobat, 16194k)
- Final Environmental Statement (Acrobat, 11880k)
- Planning Committee Minutes (Acrobat, 39k)
- Committee Report (Word, 92k)
- Further correspondence on revised SWMP (Web page, 27k)
- Correspondence on revised SWMP (Web page, 18k)
- Revised Engineering Layout plan (Acrobat, 385k)
- Decision Notice (Word, 95k)
- Response from EA on info re conds 21 & 22 (Rich text, 44k)
- Revised Headwall Construction Detail drawing (Acrobat, 106k)
- Flood Risk Assessment (Acrobat, 1257k)
- Water Vole Survey (Word, 6084k)
- Reptile Mitigation Strategy - cond 19 (Acrobat, 1878k)
- Reptile Survey Report (Word, 3970k)
- Approval of revised condition details - conds 24 & 28 (Word, 52k)
- Extended Phase 1 Ecological Survey (Word, 11754k)
- Breeding Bird Survey (Word, 3234k)
- Condition 22 - Engineering Layout Plan (Acrobat, 2248k)
- Condition 7 - Layout Drawing (Acrobat, 2165k)
- Sustainability and Sustainable Waste Management Statement (Acrobat, 2585k)
- Geo-Environmental Assessment (Acrobat, 5112k)
- Approval of condition details (Word, 53k)
- Planning Support Statement (Acrobat, 624k)
- Revision 3 SWMP from Colas (Excel, 275k)
- Approval of condition details - Cond 7 (lighting) (Word, 50k)
- Sections (Acrobat, 688k)
- Plan : Site Layout Proposed HWRS (Acrobat, 2766k)
- Condition 21 - Entrance Bridge General Arrangement Plan (Acrobat, 1704k)
- Conditions 24,25,27,28 - Construction Environmental Management Plan (Acrobat, 529k)
- Approval of condition details (Word, 52k)
- Plan : Site Layout & Proposed Contours (Acrobat, 2641k)
- Condition 7 - Lighting Calculation Presentation (Acrobat, 1893k)
- Elevations (Acrobat, 649k)
- U-McGougan note to EA on revised Headwall (Web page, 14k)
- Condition 22 - Stormbloc Storage System Construction Detail Plan (Acrobat, 131k)
- Landscape Strategy - cond 20 (Acrobat, 304k)
- Further correspondence on revised SWMP incl Rev 3 (Web page, 27k)
- Condition 22 - Windes Output for Attenuation Calculations (Acrobat, 871k)
- Condition 22 - Headwall Construction Detail Plan (Acrobat, 83k)
- Veg Mitigation Clearance Method - re conds 19 & 20 (Acrobat, 2069k)
- Transport Assessment (Acrobat, 4174k)
Related content
See also: Using the Planning Register and About the Planning Register.